01
Foundation · wet areas · terrace
Waterproofing
The one treatment nobody should negotiate on. It goes under the tiles — anything applied after is a repair.
- Four separate jobs: foundation, wet areas, terrace, water tanks — each needs its own product.
- In bathrooms: fillets at corners, coving at drains, two coats on the floor and 1–1.5 m up the walls.
- Insist on a 48-hour ponding test before tiling. No test, no sign-off.
- Cementitious for bathrooms and tanks, PU or liquid membrane for terraces, bituminous for foundations.
- Get the 5–10 year warranty in writing, from the applicator and the brand.

Where to source it





